اخبار
Meeting of the Acting Deputy Minister of Technical Affairs of the Ministry of Public Works with the President of the World Food Program in Afghanistan and the UN Special Representative for Afghanistan
Meeting of the Acting Deputy Minister of Technical Affairs of the Ministry of Public Works with the President of the World Food Program in Afghanistan and the UN Special Representative. . .
Maintenance of 6.98 km part of Kabul-Kandahar highway completed
Zabul: Ministry of Public Works announced the periodic maintenance and rebuilding of a 6.98-kilometer long road in the Shajoi district of Zabul province, which is a part of the Kabul. . .
Daikundi: The urban roads of Nili City reach 73% progress
The 8.8 km long and 14 meters wide urban roads project in Nili city, the capital of Daikundi province, is underway and has reached 73% of physical progress, so far.
According to the. . .
The "Herat-Chesht Sharif" road project reaches 52.8% work progress
Herat: As a main section of the east-west corridor; the first lot of road between Herat and Chesht-e-Sharif, which is 35 km long and 12.3 meters wide, has achieved 52.8 percent of. . .
MoPW builds a 100-meter-long RCC bridge over Kabul River in Laghman
Laghman: Ministry of Public Works announced the construction of a 100-meter-long RCC concrete bridge, which is located above the Kabul Sea in Aziz Khan Area of Qarghayi district of. . .
Kapisa: Construction of 5.66 Km road in "Hesa II" district reaches 60% progress
This 5.66 kilometer-long rigid pavement road project, which extends from Sayed Khan village and connects to the central town of Hesa II district of Kapisa province, is under speedy. . .
Periodic maintenance of Aibak-Mazar-e-Sharif highway has began
Balkh/Samangan: In order to maintain and take care of the national highways, the periodic maintenance of the damaged pavement and culverts of the Aibak-Mazar-e-Sharif public highway. . .
With 55% overall progress; the “Hijart Kalai” road project enters to asphalting phase
This 6.5-kilometer-long road project, which is located in a semi-urban area that’s named “Hijrat Kalai”, has reached 55 percent of work progress so far.
According to the Ministry of. . .
Rabat - Miramur road project hits 60% work progress
Daikundi: A 12 kilometer long and 8-meter wide road project located in Daikundi province, which starts from Rabat Bazar and ends in the "Splan" area of Miramour district, is underway. . .