A rigid pavement road is under construction in the Bagram district

ناپیژنده (not verified)
چهارشنبه ۱۴۰۰/۳/۱۲ - ۱۰:۵۷
A rigid pavement road is under construction in the Bagram district

Parwan: A 1.5 km long rigid pavement road project located in Qala-e-Malik village of Bagram, district of Parwan province, is under construction and its work is still going on with 20% progress.

The contract for this project, worth more than 13 million Afghanis, has been signed between the Ministry of Public Works and the Qala-e-Malik village development council, and the budget of the project is being funded by the Afghan government.

With the completion of this road, besides the Qala-e-Malek village, the problems of the neighboring villages will also be solved.

According to the NRAP's (National Road Access Program) coordinating body of MoPW, during the construction of this project, some 6,859 working days have been provided for the residents of the Bagram district.
 

MoPW Media Team - Kabul

...

3 میاشتې 3 اونی ago

...

تازه خبرونه

پنجشنبه ۱۴۰۴/۹/۲۷ - ۱۲:۵۴
Background image

د ټولګټو وزارت د سړکونو د ساتنې او څارنې مرستیال کنړ ولایت ته سفر وکړ

د ا.ا.ا د ټولګټو وزارت د سړکونو د ساتنې او څارنې مرستیال، محترم الحاج معاون ملا عبدالجبار، ختیځو ولایتونو د سفر په لړ کې کنړ ولایت ته سفر وکړ او هلته یې د اسعدآباد – ناړۍ پر مسیر د غازي. . .

پنجشنبه ۱۴۰۴/۹/۲۷ - ۱۰:۱۰
Background image

په لغمان ولایت کې د یو پایه ۱۰۰ متره پل د رغونې چارې د څه باندې ۵۲ میلیونه افغانیو په ارزښت پیل شوې

د ا.ا.ا د تولګټو وزارت د ځایي اوسیدونکو د ستونزو د حل په موخه، د لغمان ولایت اړوند ده زیارت کلي د علیشنګ پر سیند د یو پایه پُل د رغونې چارې د څه باندې ۵۲ میلیونه افغانیو په ارزښت د. . .

سه‌شنبه ۱۴۰۴/۹/۲۵ - ۱۳:۵۷
Background image

ټولګټو وزارت د سړکونو د ساتنې او څارنې مرستیال د هېواد ختیځ زون ته سفر وکړ

د ا.ا.ا د ټولګټو وزارت د سړکونو د ساتنې او څارنې مرستیال، محترم الحاج معاون ملا عبدالجبار، د یو تخنیکي او مسلکي پلاوي په ملتیا د ټولګټو وزارت د روانو رغنیزو او زیربنایي پروژو د ارزونې،. . .

BACK TO NEWS