اخبار
Taang-e-Logar to Chehal Dukhtaran road project reaches 38% work progress
The construction work of the Taang-e-Logar to Chehal Dukhtaran road project, which is a part of the main highway that stretches from capital Kabul toward the south-eastern provinces,. . .
Kunduz: The Bishkipa road project is ready for operation
The Bishkipa concrete road project located in Kunduz province, which is 14.5 km long, 4 meters wide along with one-meter shoulders to each side, has been completed and ready for. . .
The Punzaia village's road has 47% work progress
Khost: The road of Punzaia that is located in the capital of Khost province, which is more than one kilometer long that including roadside ditches too, has 47% progress so far.
This. . .
Bamyan: The Bridge and 300–meter road In Waras District, reaches 92% of progress
The project of a 15-meter-long RCC bridge, including a 300-meter long gravel road, located in Waras district of Bamyan province, reached 92 percent of physical progress.
According to. . .
Balkh: Work of a rigid pavement road in Marmul district is underway
An 8.91-kilometer-long rigid pavement road project in Marmul, district of Balkh, is in the beginning period with 7% work progress and will be carried out based on the action plan.
Mini. . .
Daikundi: The entire roads of Nili city hits 70% progress
The 8.8 km long and 14 meters wide urban roads project in Nili city, the capital of Daikundi province, is underway and reached 70% of physical progress.
According to the Ministry of. . .
MoPW refers 37 employees to judiciary on suspicion of corruption
Officials of the Ministry of Public Works say during the last six months, they have referred the documents of 37 suspicion employees to the judiciary on a charge of corruption.
Accordi. . .
A rigid pavement road is under construction in the Bagram district
Parwan: A 1.5 km long rigid pavement road project located in Qala-e-Malik village of Bagram, district of Parwan province, is under construction and its work is still going on with 20%. . .
Faryab: The construction of a bridge is completed and ready for operation
Faryab: The project of 48 meters long and 12.5 meters wide RCC Bridge that’s located in Maimana city of Faryab province is ready for operation and will be inaugurated in near future.
A. . .