اخبار

Wed, May 26 2021 3:36 PM
Background image

Herat: A 11-Km Road construction is underway in Guzara district

The construction of the 11-km long asphalt road from "Dokan-e-Abul" to the “proja-e-cement” area in Gozara district of Herat province, has reached its 35 percent of work progress.

The. . .

Wed, May 26 2021 2:40 PM
Background image

Salang Highway; the blocked culverts to be re-opened

Due to the recent floods and the deposition of alluvial materials, a number of culverts on the Salang highway were blocked, and their cleaning operation has been started by the Salang. . .

Wed, May 26 2021 1:50 PM
Background image

Bamyan: The Naal Shera-Martyrs' Gate road to put into operation soon

The 6-kilometer long gravel road project, which starts from the Naal Shera area and reaches the martyrs’ gate of Bamyan center, is due to complete and will be put into operation soon.

. . .
Wed, May 26 2021 10:56 AM
Background image

Nangarhar: A 100-meter RCC bridge in Khogyani district is ready to inaugurate

The construction of a 100-meter-long RCC bridge in Surma village of Khogyani district of Nangarhar province has been completed and is ready to be inaugurated in near future.

According. . .

Mon, May 24 2021 5:13 PM
Background image

MoPW: the flooded parts of Salang-Highway repaired

As a result of the recent floods, some parts of the Salang Highway, especially the “Caraow Bridge” that was partly damaged on Saturday, have been restored and prepared for the passage. . .

Mon, May 24 2021 4:26 PM
Background image

Kabul: The project of a 5.8-km long asphalt road in Deh-Sabz hits 30% work progress

The project of a 5.8-kilometer-long asphalt road, which starts from the Khwaja Chaasht crossroads of Deh Sabz district and reaches close to the “Allahgul Mujahid Madrasa”, is under. . .

Mon, May 24 2021 3:32 PM
Background image

Faryab: The construction of “Aq Masjid Bridge” in Pashtun-Kot district is underway

The project of a Sixty meters long and five meters wide RCC concrete bridge that’s located in the Aq Masjid village of Pashtun Kot district in Faryab province is under construction.

Th. . .

Mon, May 24 2021 2:07 PM
Background image

Ghor: The project of Sarjangal Village's road reaches 28% physical progress

The 10-kilometer long rural road project, which extends from Sartika Ghal village of Lal Sarjangal district toward Dahan-e- Tika Bridge, is under construction with almost 28% physical. . .

Sun, May 23 2021 2:45 PM
Background image

Survey & Land Acquisition of the second highway of Kabul-Jalalabad resumed

The Ministry of Public Works proclaimed that the survey and land acquisition process of the second highway road project between Kabul and Jalalabad have resumed on Sunday.

As the. . .

Pagination

.

1 year 6 months ago

.