LatestShow all
The Qarabagh-Jaghori road project is underway
Ghazni: The 30.3 kilometers long and 6 meters wide road project that starts from Qarabagh district and ends in the Jaghori district of Ghazni province, has reached 42% of physical. . .
Takhar: The RCC Bridge in Asfanj village ready to inaugurate
Takhar: An RCC concrete bridge with a length of 72 meters length and 380 meters gravel road that’s located in Asfanj village of Chal district of Takhar province, is 100% completed and. . .
MoPW: the maintenance of Gardez -Tera Kotal road was completed
Paktia: The maintenance work of the mountainous road between Gardez city and Tera Kotal(Tera-Pass) a part of the Paktia-Logar highway, reached its end and the damaged parts of this road. . .
Daikundi: the road between Robat Bazar and Miramur district has 52% work progress
Daikundi: A 12 kilometer long and 8-meter wide road project located in Daikundi province, which starts from Robat Bazar of Daikundi and extends to the Splan area of Miramour district,. . .
Herat-Chesht Sharif road reaches 51% work progress
Herat: The first lot of road between Herat and Chesht-e-Sharif, which is 35 km long and 12.3 meters wide, has achieved 51 percent of physical work progress so far.
According to the. . .
Reforms in MoPW accelerates the work of projects
MoPW: The recent reform process in the Ministry of Public Works, which was undertaken by the leadership of the ministry, has made the work of development projects much faster than in. . .
Poor quality parts of the road leading to the Kunduz airport are being rebuilt
Kunduz: This 5.76 km long asphalt road with relevant buildings extends from the beginning of Bazar-e-Sardawra to the Kunduz Airport.
Based on the complaints of the people; the. . .
Salang district; an RCC Bridge is being built instead of a cable car
Parwan: In the Salang district of Parwan province, instead of a cable car passageway, the main bridge is now being built that people used to cross from the sea, it is being. . .
Maidan Wardak: The 2nd section of Chaghcharan-Gardandiwal road has 71% progress
The second part of Chaghcharan-Gardandival road is 60 kilometers long and 11 meters wide, of which 55 km is under construction in Maidan-Wardak province, and the remaining 5 km is under. . .