Kandahar: Construction of a road in Daman district reaches 22% progress

ناپیژنده (not verified)
دوشنبه ۱۴۰۰/۴/۷ - ۹:۵۹
Kandahar: Construction of a road in Daman district reaches 22% progress

This road project that extends from Taryaki Baba village of Daman district to the Kabul - Kandahar national highway, is a 4 kilometer long and 5 meters wide concrete road.

The project has been contracted between the Ministry of Public Works and a private construction company, has 22 percent progress up to date, and was funded by the Afghan Government.

This road connects the villages of Taryaki Baba, Anaar Bagh, and Mohmand with the center of Daman district and the Kabul-Kandahar national highway

During the construction of this project, some 3157 working days of employment are predicted for the local residents.

Ministry of Public Works says, with the completion of this road project, the transportation problem of the entire villages will be totally solved, forever.

MoPW Media Team - Kabul

...

7 میاشتې ago

...

تازه خبرونه

پنجشنبه ۱۴۰۵/۱/۶ - ۱۱:۳۳
Background image

په تېره اوونۍ کې د تولکټو وزارت داوسپنې پټلۍ له لارې ۱۶۹۵۶۵ مټریک ټنه انتقالات شوي دي

په تېره  اوونۍ کې (د ۱۴۰۴ هـ.ش. کال له ۲۲مې څخه د کب/حوت تر ۲۸مې) نېټې پورې د ټولګټو وزارت د اوسپنې پټلۍ له لارې ۱۶۹۵۶۵ مټریک ټنه انتقالات شوي دي.

د حیرتان بندر له لارې ۱۰۸۰۸۶ ټنه، د. . .

چهارشنبه ۱۴۰۵/۱/۵ - ۱۲:۲۴
Background image

د فراه – فراه رود ۶۱.۲ کیلومتره سړک د دویمې طبقې د بیا رغونې چارې جریان لري

د ا.ا.ا د ټولګټو وزارت له لوري په فراه ولایت کې د فراه – فراه رود ۶۱.۲ کیلومتره سړک د دویمې طبقې اسفالټ چارې د څه باندې ۳۹۵ میلیونه افغانیو په ارزښت جریان لري.

دغه سړک د فراه ولایت له. . .

سه‌شنبه ۱۴۰۵/۱/۴ - ۹:۱۳
Background image

د ټولګټو وزارت وزیر لوګر ولایت ته سفر وکړ

 

د ټولګټو وزارت وزیر محترم الحاج ملا محمد عیسی ثاني نن د اختر په درېیمه ورځ د لوګر ولایت ته سفر وکړ او هلته یې د یو شمېر پروژو له رغنیزو چارو څخه لیدنه وکړه.

نوموړي د یاد سفر په ترڅ. . .

BACK TO NEWS